High efficiency and less energy consumption. SMS Concast received order from El Marakby Steel
06.02.2013, 18:25
SMS Concast supplies the first electric arc furnace to long steel producer El Marakby Steel in Giza, Egypt. With a capacity of 350,000 tpy, the new furnace broadens El Marakby’s portfolio and strengthens the company´s competitive position.
The new meltshop will be used to feed El Marakby’s rebar mill with 130-mm square billets. The mill has a capacity of 240,000 tpy. Excess billet output will be sold to the open market.
The huge lack of power supply in Egypt challenges the production of billets. The electric arc furnace of SMS Concast offers recovery technology that fulfills the most stringent environmental regulations and contributes towards resource efficiency in steel production.
"We have had a political revolution, so it’s normal to have problems afterwards,” says Hassan El Marakby, Deputy CEO of El Marakby Steel. "In order to survive, skin-pass mills need to be integrated to create more added-value. With SMS Concast we have found a true partner to develop our business.”
Scrap from the Unites States and Europe will be used in the new furnace of El Marakby Steel. It will also be possible to load the furnace with scrap substitute up to 20 %.
Commissioning of the new furnace is scheduled for the end of 2013.
Mohamed Ismael Saad El Marakby, Deputy CEO of El Marakby Steel,
and Allessandro Cedrini, SMS Concast, signing of the contract
for a new electric arc furnace (f.l.t.r.).
Based on SMS Group information
Other company news
- 19.07.2018 For its tandem cold mill, PAO Severstal again relies on the modernization expertise of SMS group
- 10.07.2018 Vizag Steel Plant successfully commissions new bloom & round combi-caster from SMS Concast
- 05.07.2018 exlabesa group commissions SMS group to supply two light-metal extrusion presses
- 14.06.2018 350,000 tons per year of galvanized steel strip for the Chinese construction and home appliances industries
- 14.06.2018 Yongfeng Group Ltd. invests in casting technology for the production of demanding SBQ steel grades
- 26.04.2018 Celsa Barcelona chooses direct oscillation drive from SMS Concast for the upgrade of their beam blank caster with a new strand
- 12.04.2018 TMK-ARTROM starts production on new heat treatment line for pipes supplied by SMS group
- 12.04.2018 Constellium expands aluminum casthouse capacity in Dĕčín, Czech Republic, with Hertwich Engineering homogenizing furnace
- 29.03.2018 Maanshan Iron and Steel orders heavy section mill from SMS group
- 26.03.2018 MMK to implement comprehensive revamp of hot strip mill 2500 with SMS group


